Private Sector | Telangana - India | PID: 192633
Greenko Energies has proposed to develop a 3,960 MW mega pumped storage project in Mulugu district of Telangana with an investment outlay of ?18,203 crore

The project is based on the concept of non-consumptive utilisation (re-circulation) of 1.65 TMC of water from the Godavari river and involves creation of two reservoirs and setting up of 12 turbines of 330 MW each

The Ippugudem project, which is now under consideration of the Ministry of Environment and Forests for environment impact assessment (EIA), will be an off-stream project and entails construction of two reservoirs, where 1.65 TMC water will be lifted one time from the river Godavari

The project will have a surface powerhouse downstream and include 12 reversible type units of a generator/motor and a turbine pump each with a capacity of 330 MW. The company expects to complete the project within 36 months

It is a conventional hydel power unit to store and manage energy by moving water between the upper and lower reservoirs. These projects are environment friendly being emission free and are cheaper than other sources of energy

The PSP projects have gained importance as they provide robustness to the energy system where a number of the renewable energy projects are being set up. The PSP project helps generate power, help balance the grid and demand variations, when there is peak demand and when renewable sources like solar and wind are unable to meet the requirements. Currently, such requirements are met by thermal power plants

The project needs about 906 hectares of forest land and will require Forest Clearance from the Ministry of Environment and Forests

The company has submitted an application for diversion of the forest land requiring clearances from the State and the Central Government

The Expert Appraisal Committee of the Ministry of Environment and Forests, which recently met and took up the project for discussion, made certain observations. The committee, after detailed deliberations, recommended standard Terms of Reference

These include, the land shall be suitably compensated as per the provisions of the Land Acquisition Act of 2013, the project will require clearance for the 906 hectares as per the Forest (Conservation) Act, 1980, and has to conduct public hearing as per the EIA Notification, 2006

In its terms of reference, it also mentioned that there is a need for funds allocation for Corporate Environment responsibility and there is a need to secure necessary approval from the Central Water Commission for one-time utilisation of 1.65 TMC of water from the Godavari Interstate river

Apart from these the Committee also suggested that an environmental matrix during construction and operational phase needs to be submitted and the impact of development on the wildlife habitat within 10 km of the project boundary shall be studied. The proposed project is located about 7 km from the Pamed Wild Buffalo Wildlife Sanctuary

Greenko Group is a major player in the country’s renewable energy segments with projects located across several States in the country

| Updated on: 10 - Jun - 2020
Search Tenders By Product: Pump House Project
To view this paid Project you can either "Buy this Project" or subscribe our annual Project Alert Service and get access to all similar Projects. If you are registered member, please fill in the subscription form below . If not, please Register first.
Step 1 - Select a plan
Select Plan Unit Rate Subscription Validity
Rs. 29500 /-
Step 2 - If registered user, please fill below form
(*) Mandatory fields
Email Id *
States Interested In
Projects Interested In
Select Payment Type
Verification Code *
Note : As Goods and Services Tax is set to be implemented from 1st July 2017. The transition provisions under GST law applies to all services provided by e-Procurement Technologies Limited to its clients on or after 1st July 2017 and GST tax rate and other taxes are applicable as extra for all services provided.